Study report
The decision, basis, options, findings, limitations and recommended next actions.
From the first study to execution support, the work stays proportionate to the decision, the asset and the evidence.
Capability statement (opens in a new tab)Define the discussion
Select the asset setting, the decision ahead and the records available.
A starting point for discussion. The scope and deliverables are agreed after review of the project context.
A removal or closure option needs a documented basis for the next decision.
Asset inventory, scope boundary, required end state, previous studies and decision criteria.
The assessment basis, specialist inputs and decision responsibilities are agreed for the actual scope.
The work, dependencies and close-out evidence need a coordinated plan.
Asset scope, obligations already identified, current studies, proposed milestones and interfaces.
Planning follows the asset scope, jurisdiction and agreed study stage.
An engineering estimate or revision needs a clearer scope and assumptions basis.
Previous estimate, quantities, source records, method assumptions, pricing date and schedule.
Engineering inputs support the provision basis. Accounting recognition, measurement and reporting remain with the entity and its finance advisers.
A removal or dismantling concept needs to be developed or challenged.
Drawings, current condition, weight basis, access and handling constraints, isolation interfaces.
The engagement defines the study stage, disciplines, checks and deliverables required. Specialist design and well P&A inputs are scoped separately where applicable.
Work packages need clear boundaries and acceptance responsibilities.
Proposed scope, delivery model, programme, interfaces and existing procurement material.
Commercial arrangements and responsibilities are confirmed within the agreed engagement.
Applicable processes and supporting evidence need to be mapped.
Jurisdiction, asset and title or land context, planned activities, permissions and correspondence.
The relevant authorities determine assessment outcomes and approval timing.
The owner needs technical continuity through defined delivery activities.
Agreed package scope, contractor methods, technical basis, programme and review requirements.
Authority, site responsibilities and review boundaries are defined in the engagement.
Inherited records conflict or do not support an upcoming decision.
Document index, source files, revision information and the decision being supported.
A decomm.ai walkthrough can be scoped separately where the platform offering is relevant.
Outputs are tailored to the decision stage, with the assumptions, interfaces and remaining actions carried into the next review.
The decision, basis, options, findings, limitations and recommended next actions.
Scope boundaries, assumptions, interfaces, methodology and evidence position.
Cost and schedule basis, work packaging, tendering and contracting inputs.
Priorities, ownership, dependencies and information that still needs to be verified.
The applicable framework depends on the jurisdiction and the asset scope.
The Offshore Petroleum and Greenhouse Gas Storage Act 2006 provides the Commonwealth offshore framework. NOPSEMA identifies removal of all property as the base case and regulates compliance with decommissioning obligations.
NOPSEMA guidance ↗ (opens in a new tab)For a petroleum permit, lease or licence, the titleholder applies through NOPTA for Joint Authority consent to surrender. This title process sits alongside decommissioning obligations and NOPSEMA’s assessment role.
NOPTA title process ↗ (opens in a new tab)Onshore requirements follow the relevant state regime. In Western Australia, onshore petroleum proposals are assessed under the Petroleum and Geothermal Energy Resources Act 1967. Other agency assessments and approvals may also apply.
WA petroleum framework ↗ (opens in a new tab)Tell us about the asset, the work required and the timing. Endura can help define an appropriate scope of support.