Technical library
Technical notes, review tools and public references for decommissioning planning, engineering and cost-basis review.
The evidence behind a defensible closure estimate
A useful estimate lets another person reconstruct the route from the asset record to the number, including the assumptions that could change it.
Read technical noteThe temporary state can govern the lift
A removal scheme needs a structural explanation for every transition, including the states in which the object is only partly released.
Read technical noteInherited asset records: find the evidence that changes the decision
The first useful result from an inherited data room is a map of what can be relied on, what conflicts and what must be checked in the field.
Read technical noteHow to read a NOPSEMA record without overreading it
Public regulatory records are valuable when their status, scope and date travel with every conclusion drawn from them.
Read technical noteClosure decisions are often won or lost at the interfaces
Define what closure means for each asset and handover before dividing the work into contracts.
Read technical noteEstimate drift: explain what changed before explaining the total
A movement in the reported provision can conceal several engineering and financial changes that point in different directions.
Read technical noteNo technical notes match this search. Try a broader term, or .
Tools and references
ARO defensibility checklist
Twelve checks to structure a review of the evidence behind a cost basis.
Open checklistAsset explorer
Explore nine evidence domains on an illustrative offshore platform or onshore plant.
Open explorerAustralian offshore records
Ten selected NOPSEMA regulatory records with scope summaries, reported dates and original sources. Industry context, not an Endura project portfolio.
Browse public recordsGlossary
Definitions, scope boundaries and source references for common technical terms.
Browse definitions